01 NCAC 41B .0507. PROPOSAL EVALUATION  


Latest version.
  • (a)  Evaluation criteria shall include those specified by G.S. 143-64.17A(b) and (d).

    (b)  Evaluation criteria for the proposal shall also include the following:

    (1)           Life cycle cost analysis as defined in G.S. 143-64.15.

    (2)           Certification by a registered engineer that the measurement and verification protocol presented in the proposal is capable of measuring actual or projected savings.

    (3)           A process of annual third party measurement and verification of savings in accordance with the pre-defined and certified protocol found in 01 NCAC 41B .0510.  The cost of this process shall be included in the total cost of the contract.

    (4)           The total cost based on Office of Treasurer cost of financing estimate and cost based on Qualified Provider or third party financing in the response.

     

History Note:        Authority G.S. 143-64.17F; 143-64.17H;

Temporary Adoption Eff. August 1, 2003;

Temporary Adoption Expired April 27, 2004;

Eff. July 1, 2004.