02 NCAC 59G .0105. APPLICATION OF BMP APPROVAL AND TECHNICAL SPECIALIST DESIGNATION TO WATER QUALITY PROTECTION PROGRAMS


Latest version.
  • Approved BMPs or systems of BMPs and technical specialist designation by the Commission under this Subchapter may be used to satisfy the requirements of:

    (1)           The Neuse Basin Rule in 15A NCAC 02B .0238(8)(b)(x) and (c)(i) and 15A NCAC 02B .0239(2)(a) and (b);

    (2)           The Tar-Pamlico Rule in 15A NCAC 02B .0256 and 15A NCAC 02B .0257(f)(2); and

    (3)           Other applicable water quality protection rules adopted by the EMC or other commissions that include BMP development or implementation or technical specialist designation by the Commission.

     

History Note:        Authority G.S. 106-840; 139-4;

Temporary Adoption Eff. October 22, 2001;

Eff. April 1, 2003;

Transferred from 15A NCAC 06H .0105 Eff. May 1, 2012.