02 NCAC 60C .0209. REHABILITATION OF PROJECT SITE


Latest version.
  • Areas on the project site that have the potential for accelerated erosion, resulting in concentrated flow directly entering an intermittent or perennial stream or perennial waterbody, shall be provided with ground cover or other means of adequate sedimentation control within 30 working days after ceasing any phase of an operation or beginning a period of inactivity. Treatment and maintenance of those areas shall be sufficient to restrain accelerated erosion and prevent visible sediment from entering intermittent and perennial streams and perennial waterbodies until the site is permanently stabilized.

     

History Note:        Authority G.S. 113A-52.1;

Eff. January 1, 1990;

Transferred from 15A NCAC 01I .0209 Eff. April 1, 2014.