10A NCAC 14J .1536. GENERAL PROVISIONS REGARDING EQUIPMENT INSTALLATION  


Latest version.
  • (a)  All steel equipment, except tool‑resisting bars embedded in concrete floors and other such parts that are enameled or plated, shall have a prime coat applied in the fabricating shop.

    (b)  Paint shall be of good metallic grade.

    (c)  All riveting and welding connected with the installation of security equipment shall meet specifications indicated by the architect.

     

History Note:        Authority G.S. 143B‑153; 153A‑220; 153A‑221;

Eff. June 1, 1990.