10A NCAC 41C .0807. STANDARDS FOR CONDUCTING LEAD-BASED PAINT ACTIVITIES  


Latest version.
  • (a)  All lead-based paint activities and design activities shall be conducted in accordance with 40 CFR 745 Subpart L, Subsection .227.

    (b)  For each inspection, risk assessment, or lead hazard screen conducted, the certified inspector or risk assessor shall submit to the Program a legible copy of the summary of the activity on a form provided or approved by the Program.  The form shall be submitted within 45 days of the activity.

     

History Note:        Authority G.S. 130A-453.10; 130A-453.11; 150B-21.1(a)(3);

Eff. July 1, 1998.