15A NCAC 01N .0303. ELIGIBLE PROJECT COSTS  


Latest version.
  • (a)  Project construction costs eligible for a loan under this Subchapter are limited to:

    (1)           Planning, including system and needs assessment, the preparation of a local water supply plan and the preparation of a water system management plan;

    (2)           Environmental assessment reports, including all federal cross-cutters;

    (3)           Design;

    (4)           Construction;

    (5)           Legal, fiscal, and administrative costs;

    (6            Contingency costs; and

    (7)           Land acquisition integral to the project and acquired from a willing seller.

    (b)  Loans may be up to 100 percent of allowable construction project costs.

     

History Note:        Authority G.S. 159G-22; 159G-35; 159G-44;

Temporary Adoption Eff. January 31, 1998;

Eff. April 1, 1999;

Amended Eff. February 1, 2008.