15A NCAC 01N .0303. ELIGIBLE PROJECT COSTS
-
(a) Project construction costs eligible for a loan under this Subchapter are limited to:
(1) Planning, including system and needs assessment, the preparation of a local water supply plan and the preparation of a water system management plan;
(2) Environmental assessment reports, including all federal cross-cutters;
(3) Design;
(4) Construction;
(5) Legal, fiscal, and administrative costs;
(6 Contingency costs; and
(7) Land acquisition integral to the project and acquired from a willing seller.
(b) Loans may be up to 100 percent of allowable construction project costs.
History Note: Authority G.S. 159G-22; 159G-35; 159G-44;
Temporary Adoption Eff. January 31, 1998;
Eff. April 1, 1999;
Amended Eff. February 1, 2008.