15A NCAC 01N .0402. APPLICATION PROCEDURES  


Latest version.
  • (a)  Applications for loans shall be submitted on forms provided by the Division and shall be accompanied by all documents such as the Preliminary Engineering Report (PER), assurances, and other information required by the instructions for completing and filing the applications.  Information concerning any grant or loan funds from any other source for which the applicant has applied shall be disclosed on the application.

    (b)  Every application shall be accompanied by an adopted resolution or other documentation as required by G.S. 159G-37.  The resolution or documentation shall be certified or attested to as a true and correct copy as adopted.

    (c)  An applicant shall furnish additional information upon the request of the Division as required by these Rules.

    (d)  A project shall not receive a priority rating unless the application contains sufficient information on the day of rating for the receiving agency to review and assign priority points.

    (e)  An application may be withdrawn from consideration upon request of the applicant but if it is resubmitted it shall be considered as a new application subject to Rule .0401 of this Subchapter.

     

History Note:        Authority G.S. 159G-22; 159G-35; 159G-44;

Temporary Adoption Eff. January 31, 1998;

Eff. April 1, 1999;

Amended Eff. February 1, 2008.