15A NCAC 01N .0502. ASSIGNMENT OF PRIORITIES  


Latest version.
  • (a)  During each review period the Division shall assign a priority rating to each eligible application for inclusion in the state intended use plan; the priority rating shall be determined in accordance with the rating criteria and points established pursuant to G.S. 159G-35.

    (b)  The Division may establish a priority rating when two or more applications receive the same number of priority points.  The project receiving more points for affordability shall receive the higher priority.  If the affordability points awarded the projects are equal, the project with the smaller population shall receive the greater priority.

    (c)  Only the eligible portions of a project shall receive a priority rating.

    (d)  The Division may assign a different priority rating to each substantially independent part of a proposed project.

    (e)  Any applications that are not awarded assistance during a review period shall be held over and considered for a second review in accordance with G.S. 159G-39(c).

     

History Note:        Authority G.S. 159G-35; 159G-44;

Temporary Adoption Eff. January 31, 1998;

Eff. April 1, 1999;

Amended Eff. February 1, 2008.