15A NCAC 02H .0905. POTW PRETREATMENT PROGRAM IMPLEMENTATION REQUIREMENTS  


Latest version.
  • Except where specified differently in this Section, the POTW pretreatment program requirements promulgated by the Environmental Protection Agency and codified as 40 CFR Part 403.8(f) and (g) are hereby incorporated by reference including any subsequent amendments and editions.  This material is available for inspection at the locations listed in Rule .0901 of this Section and at http://cfpub1.epa.gov/npdes/home.cfm?program_id=3.  In general, the implementation of a pretreatment program involves the updating of the sewer use ordinance (SUO); implementation of industrial waste survey (IWS) activities; updating of the headworks analysis (HWA), or technical basis for local limits; implementation of the long or short term monitoring plan (LTMP/STMP); implementation of compliance activities, including sampling and inspection of significant industrial users; maintenance of control authority organization description;  maintenance of staffing and funding information; implementation of the enforcement response plan (ERP), and reporting to the Division on pretreatment program activities.

     

History Note:        Authority G.S. 143‑215.1(a); 143‑215.1(b); 143‑215.3(a)(1); 143‑215.3(a)(14); 150B‑21.6; 153A‑274; 153A‑275; 160A‑311; 160A‑312;

Eff. March 28, 1980;

Amended Eff. April 1, 2011; November 1, 1994; October 1, 1987; December 1, 1984.