North Carolina Administrative Code (Last Updated: November 13, 2014) |
TITLE 15A. ENVIRONMENT AND NATURAL RESOURCES |
CHAPTER 02. ENVIRONMENTAL MANAGEMENT |
SUBCHAPTER K. DAM SAFETY |
15A NCAC 02K .0203. PROFESSIONAL ENGINEER REQUIREMENTS
Latest version.
-
The design, preparation of the plans and specifications, inspection of the construction of or on the dam, and certification that the dam was constructed, repaired, altered, or removed according to the plans approved by the Director and that the dam or its remains are safe shall be done by a legally qualified engineer and shall bear his professional seal unless exempted under the provisions of G.S. 89C‑25.
History Note: Authority G.S. 143‑215.29,‑31;
Eff. June 15, 1980.