15A NCAC 02L .0404. REQUIRED INITIAL ABATEMENT ACTIONS BY RESPONSIBLE PARTY  


Latest version.
  • A responsible party shall:

    (1)           take immediate action to prevent any further discharge or release of petroleum from the underground storage tank; identify and mitigate any fire, explosion or vapor hazard; remove any free product; and comply with the requirements of Rules .0601 through .0604 and .0701 through .0703 and .0705 of Subchapter 02N;

    (2)           incorporate the requirements of 15A NCAC 02N .0704 into the submittal required under Item (3) of this Paragraph or the limited site assessment report required under 15A NCAC 02L .0405 of this Section, whichever is applicable.  Such submittals shall constitute compliance with the reporting requirements of 15A NCAC 02N .0704(b);

    (3)           submit within 90 days of the discovery of the discharge or release a soil contamination report containing information sufficient to show that remaining unsaturated soil in the side walls and at the base of the excavation does not contain contaminant levels which exceed either the "soil-to-groundwater" or the residential maximum soil contaminant concentrations established by the Department pursuant to 15A NCAC 02L .0411 of this Section, whichever is lower.  If such showing is made, the discharge or release shall be classified as low risk by the Department;

     

History Note:        Authority G.S. 143-215.2; 143-215.3(a)(1); 143-215.94A; 143-215.94E; 143-215.94T; 143-215.94V; 143B-282; 1995 (Reg. Sess. 1996) c. 648,s. 1;

Recodified from 15A NCAC 02L .0115(c)(1)-(3);

Amended Eff. December 1, 2005.