15A NCAC 02Q .0510. PERMITTING OF FACILITIES AT MULTIPLE TEMPORARY SITES  


Latest version.
  • (a)  The Director may issue a single permit authorizing emissions from similar operations by the same facility owner or operator at multiple temporary sites.

    (b)  In order for a facility to qualify for a permit for multiple temporary site under this Rule, the operation must involve at least one change of site during the term of the permit.

    (c)  Sources subject to Title IV shall not be eligible for a permit under this Section.

    (d)  Permits for facilities at multiple temporary sites shall include:

    (1)           identification of each site;

    (2)           conditions that will assure compliance with all applicable requirements at all authorized locations;

    (3)           requirements that the permittee notify the Division at least 10 days in advance of each change of location; and

    (4)           conditions that assure compliance with all other provisions of this Section.

     

History Note:        Filed as a Temporary Adoption Eff. March 8, 1994 for a period of 180 days or until the permanent

rule becomes effective, whichever is sooner;

Authority G.S. 143‑215.3(a)(1); 143‑215.107(a)(10); 143‑215.108;

Eff. July 1, 1994.