15A NCAC 02Q .0601. PURPOSE OF SECTION AND REQUIREMENT FOR A PERMIT
-
(a) The purpose of this Section is to describe the procedures to be followed in applying for and issuing a permit for a transportation facility.
(b) The owner or developer of a transportation facility subject to the requirements of 15A NCAC 2D .0800 shall obtain a construction only permit following the procedures in this Section. An operation permit is not needed.
(c) The owner or developer of a transportation facility required to have a permit under this Section shall not commence construction or modification of a transportation facility until he has applied for and received a construction permit.
History Note: Filed as a Temporary Adoption Eff. March 8, 1994 for a period of 180 days or until the permanent rule becomes effective, whichever is sooner;
Authority G.S. 143‑215.3(a)(1); 143‑215.108; 143‑215.109;
Eff. July 1, 1994.