15A NCAC 05D .0108. COMPLETION REPORT  


Latest version.
  • (a)  Within 30 days after the completion of a producing well drilled for oil or gas, or the recompletion of a producing well into a different formation, or where the producing interval is changed, a completion report shall be filed with the director on a form prescribed by the director.  The information required shall include the following:

    (1)           name, number and location of the well;

    (2)           lease name;

    (3)           date of completion and date of recompletion;

    (4)           total depth;

    (5)           record of stimulation;

    (6)           initial potential test and method;

    (7)           casing and tubing size and weight;

    (8)           cement record including squeeze jobs or remedial cementing;

    (9)           types of borehole geophysical logs run.  (Copies of logs not previously furnished should be included.)

    (b)  If such information is of a confidential nature, then upon request of the operator, the director will hold such information in confidence for a period of one year.  Extensions of this confidentiality shall be allowed up to a maximum of one year at the discretion of the director.

     

History Note:        Authority G.S. 113‑391;

Eff. February 1, 1976;

Amended Eff. October 1, 1984.