19A NCAC 02D .0705. REVIEW PROCEDURES  


Latest version.
  • (a)  Upon receipt of a completed application, the Chief Engineer shall acknowledge the receipt and initiate a preliminary investigation and review.

    (b)  In reviewing the application, the following factors shall be taken into consideration as a basis for approval or disapproval:

    (1)           traffic count;

    (2)           availability of an acceptable detour;

    (3)           length of an acceptable detour;

    (4)           type road surface (paved or unpaved);

    (5)           school bus route – number of buses;

    (6)           anticipated frequency of flooding;

    (7)           anticipated duration of flooding;

    (8)           cost estimates to raise the roadway above flood stage;

    (9)           probability of future significant changes in traffic characteristics;

    (10)         comments from affected utilities; and

    (11)         comments from general public.

    (c)  Under no condition shall a permit be issued to allow flooding which would isolate any home, business, or other commercial establishment.

     

History Note:        Authority G.S. 136-64.1(d);

Eff. July 1, 1978;

Amended Eff. December 1, 2012.