02 NCAC 52J .0606. INSPECTIONS AND RECORDS  


Latest version.
  • (a)  Chamber seals, exhaust flow, carbon monoxide monitors and other equipment used in the euthanasia process in certified facilities shall be inspected at least monthly and repaired or replaced as necessary.

    (b)  The chamber must be inspected at least annually by the manufacturer, its authorized representative or an industrial hygienist knowledgeable about the manufacture and operation of the chamber.

    (c)  A record shall be made of each inspection recording the results, the date of the inspection, and the name of the person performing the inspection.  The record shall be maintained in the policy and procedure manual for at least two years.

     

History Note:        Authority G.S. 19A-24;

Eff. March 23, 2009.