04 NCAC 02T .1101. APPLICATION FOR FUEL ALCOHOL PERMIT: OPERATION  


Latest version.
  • (a)  Required Information.  In addition to the information required by G.S. 18B‑900 and G.S. 18B‑902, an applicant for a Fuel Alcohol Permit shall furnish the following information to the Commission:

    (1)           Federal Operating Permit number and a photocopy of the Federal Operating Permit; and

    (2)           detailed diagram of fuel alcohol plant premises, identifying roads, streams, lakes, buildings, and other structures on or features of the land that will locate exactly the place where plant operations will occur.

    (b)  No person shall commence the operation of a fuel alcohol plant without first applying for and obtaining a Fuel Alcohol Permit from the Commission.

     

History Note:        Authority G.S. 18B‑207; 18B‑1105(b);

Eff. January 1, 1982;

Amended Eff. May 1, 1984.