SUBCHAPTER B. EROSION AND SEDIMENT CONTROL  


15A NCAC 04B .0101. AUTHORITY [REPEALED]
15A NCAC 04B .0102-0103. REPEALED
15A NCAC 04B .0104. DEFINITIONS [REPEALED]
15A NCAC 04B .0105. PROTECTION OF PROPERTY
15A NCAC 04B .0106. BASIC CONTROL OBJECTIVES
15A NCAC 04B .0107. MANDATORY STANDARDS FOR LAND-DISTURBING ACTIVITY
15A NCAC 04B .0108. DESIGN AND PERFORMANCE STANDARD
15A NCAC 04B .0109. STORM WATER OUTLET PROTECTION
15A NCAC 04B .0110. BORROW AND WASTE AREAS
15A NCAC 04B .0111. ACCESS AND HAUL ROADS
15A NCAC 04B .0112. OPERATIONS IN LAKES OR NATURAL WATERCOURSES
15A NCAC 04B .0113. RESPONSIBILITY FOR MAINTENANCE
15A NCAC 04B .0114. GUIDELINES FOR EROSION AND SEDIMENT CONTROL PRACTICES [REPEALED]
15A NCAC 04B .0115. ADDITIONAL MEASURES
15A NCAC 04B .0116. EXISTING UNCOVERED AREAS
15A NCAC 04B .0117. STATEMENT OF FINANCIAL RESPONSIBILITY AND OWNERSHIP [REPEALED]
15A NCAC 04B .0118. APPROVAL OF PLANS
15A NCAC 04B .0119. COMPLIANCE WITH PLAN REQUIREMENT [REPEALED]
15A NCAC 04B .0120. INSPECTIONS AND INVESTIGATIONS
15A NCAC 04B .0121. PENALTIES [REPEALED]
15A NCAC 04B .0122. SEVERABILITY CLAUSE
15A NCAC 04B .0123. EFFECTIVE DATE [REPEALED]
15A NCAC 04B .0124. DESIGN STANDARDS IN SENSITIVE WATERSHEDS
15A NCAC 04B .0125. BUFFER ZONE REQUIREMENTS
15A NCAC 04B .0126. PLAN REVIEW FEE
15A NCAC 04B .0127. PLAN APPROVAL CERTIFICATE
15A NCAC 04B .0128. RAILROAD COMPANIES
15A NCAC 04B .0129. EROSION CONTROL PLAN EXPIRATION DATE
15A NCAC 04B .0130. EMERGENCIES
15A NCAC 04B .0131. SELF-INSPECTIONS
15A NCAC 04B .0132. DESIGN STANDARDS FOR THE UPPER NEUSE RIVER BASIN (FALLS LAKE WATERSHED)

Note